Home → SCL MPW Services

SCL MPW Services


Announcement for Tape-out submissions for MPW Shuttle-I at 180nm, SCL Mohali through ChipIN Centre for Participating Institutions under C2S Programme for fabricating them in November 2024

ChipIN Centre (C-DAC Bangalore) is now accepting design tape-outs for MPW Shuttle-I at 180nm, SCL Mohali, from Participating Institutions (PIs) under the C2S (Chips to Start-up) Programme for fabricating them in November 2024 as per following timelines.

# MPW Shuttle - I Timelines
1 MPW Shuttle - I Announcement by ChipIN Centre for fabrication of designs at 180nm, SCL Mohali by Participating Institutions (PI) 20th September 2024
2 PIs to submit request to ChipIN Centre for obtaining the Silicon number from SCL. 01st October 2024
3 ChipIN Centre to provide Silicon number to the PI 04th October 2024
4 Submission of the initial version of design by PIs to ChipIN Centre as per guidelines of Design Tapeout Submission Form (i.e. Si Number, report on DRC clean, antenna check etc.) 25th October 2024
5 ChipIN Centre to provide a Verification Report to PIs for initial version of designs submitted by PIs. 29th October 2024
6 PIs to submit the final version of fab-ready design/ GDS to ChipIN Centre addressing the issues, if any, highlighted in the Verification Report. 21st November 2024
7 Submission of designs of PIs by ChipIN Centre to SCL for fabrication. 25th November 2024
8 The designs to go in the fabrication lot at SCL Mohali January 2025
9 Receiving of fabricated designs in packaged form by the PIs 31st September 2025

Design Tapeout Submission Process by Participating Institutions (PIs)
Step 1: Obtaining Silicon Number by PIs
  1. PIs to send an e-mail to ChipIN Centre to get the Silicon Number with duly filled Silicon_Number_Generation_Form (see attachment) by 01st October 2024. Please go through the Silicon_Numbering_Table (see attachment) for various code details to be used for filling it.
  2. ChipIN Centre to provide Silicon number to the PI.
Step 2: Submission of Design
  1. Participating Institutions (PIs) to provide their design details in the Design Tapeout Submission Form (DTSF) and Process Information Sheet (PIS sheet) for projects intended for tapeout at 180nm, SCL Mohali.
  2. The DTSF provides information on various items, which must be considered when a design is submitted by PI to ChipIN Centre.
  3. All the columns in the PIS sheet must be filled with the drop-in information, wherever provided. At places, where drop-in is not given, designer must write as per the column description only.

  4. Design Tapeout Submission Form (DTSF) (see attachment)
    Process Information Sheet (PIS sheet) (see attachment)
General Guidelines
1.0 Data Format and Communication:
  1. Acceptable database format is GDSII only.
  2. Complete database must be sent through e-mail to chipin@cdac.in. Do not provide any Google Drive link.
  3. The communication has to be addressed through e-mail at: ChipIN Centre,
    C2S Programme,
    C-DAC Bangalore, Opp. HAL Aeroengine Division,
    Old Madras Road, Byappanahalli,
    Bengaluru - 560 038.
2.0 Layout Grid
  1. Minimum grid size used in the GDSII must be integer multiple of 0.005 µm.
  2. Final GDSII window (including seal ring) must have Bottom left corner at (0,0) coordinate and the Top-Right corner coordinate must be rounded off to closest even number and it should be without any decimal places i.e., 10102 µm or 10100 µm for the case if coordinate comes at 10101.395 µm.
3.0 Design Kit
  1. Do not rename cell names used in cell library.
  2. Do not use library cell name for custom designed cells.
  3. Do not edit standard cell library and I/O library.
4.0 Design Verification
  1. The PIs to provide a clean GDSII database w.r.t. DRC, Density and Antenna rules.
  2. Before taping out the data, please provide checksum for GDSII file. Save the checksum value and byte count in a file, so that the same can be crosschecked at our end. e.g. cksum EDU0001_01012016_v1.gds 12345678 204 EDU0001_01012016_v1.gds
  3. For GDSII integrity check while data transfer MD5 checksum is must and need to be provided in addition to checksum so that the same can be crosschecked at our end. For calculating MD5, just open Linux terminal and type: md5sum ‘filename’ e.g. md5sum SC0001-0E_25012023_v1.gds
  4. GDSII name and Top cell name format: silicon_no_date_version.gds (date format should be ddmmyyyy) and top cell name should be "silicon number" only.
  5. All the reports should be named as GDSII name. For instance, siliconnum_date_version_drc.rpt, siliconnum_date_version_drc.summary, siliconnum_date_version_ant.rpt etc.
  6. All the columns in the Process Information Sheet (PIS sheet) must be filled with the drop-in information wherever provided. At places where drop-in is not given, designer must write as per the column description only.

5.0 Tapeout Checklist
# Device Related Information Yes/No
1 GDSII database provided
2 Silicon Number with PCI is mandatory. GDSII for this is included in the PDK. (Layer revision block may be placed if space permit)
3 Seal Ring with GND connection inserted?
4 Is DRC along with dummy fill Report clean?
5 Is Antenna along with dummy fill Report clean?
6 Dummy Fill done
7 Grid size 0.005µm used for layout
8 Whether Pads connected till top metal (TOP_M)?
9 Final Chip Origin should be at (0,0) after seal ring insertion.
10 Process Information Sheet duly filled?

6.0 Reports to be Included
1 Final DRC run Reports (Result database including density logs, summary, transcript, runset version)
2 Final Antenna Report (Result database, summary, transcript, runset version)
3 Devices type (or legal devices) used in layout report
4 Stream out log files
5 List of 3rd party IP used (If any with prior approval from SCL)
6 List of SCL IP used (If any with prior approval from SCL)
7 List of all legal layers used before silicon number insertion in Excel Format (Layer Name + layer number + datatype)
8 Coordinate of Silicon number
9 Process Information Sheet (Attached PIS Excel)

7.0 Tape-out and Packaging Related Checklist
# Tape-out and Packaging Related Checklist Please Tick / Specify
1 Mention the Die size including seal ring. Options supported: 2 x 2 mm², 3 x 3 mm², 4 x 4 mm², or 5 x 5 mm²
(No other size is supported in the current tapeout under this program)
For sizes greater than 5 x 5 mm² ChipIN will contact SCL’s PPG.
Specify 2 x 2 mm² or 3 x 3 mm² or 4 x 4 mm² or 5 x 5 mm²
2 The design should have a seal ring around it. The distance between chip boundary to seal ring should be a minimum of 10µm with DRC Clean.
3 The seal ring is connected to VSS (Ground).
4 No. of pins for Packaging the IC
(Currently no. of pins should not be more than 100 for packaging).
Specify the No. of Pins
5 Package selected for packaging (Refer Appendix –I) - Specify the Package Serial Number.
6 The minimum pitch between two adjacent bond pads is 90µm for all bond pads.

8.0 Preferred Die Size and Plastic Packages (QFN ONLY)
Package Serial No. Die Size (including seal ring) (mm) Package Size W x L (mm) Die Attach Pad Size (mm) No. of Pins Package Lead Pitch (mm) Package Name
1 2.0 x 2.0 4.0 x 4.0 2.8 x 2.8 16 0.65 16L QFN
2 3.0 x 3.0 5.0 x 5.0 3.1 x 3.1 16 0.8 16L QFN
3 2.0 x 2.0 4.0 x 4.0 2.8 x 2.8 24 0.4 24L QFN
4 3.0 x 3.0 5.0 x 5.0 3.8 x 3.8 24 0.65 24L QFN
5 2.0 x 2.0 4.0 x 4.0 2.8 x 2.8 28 0.4 28L QFN
6 3.0 x 3.0 5.0 x 5.0 3.6 x 3.6 28 0.5 28L QFN
7 2.0 x 2.0 5.0 x 5.0 3.5 x 3.5 32 0.5 32L QFN
8 3.0 x 3.0
9 2.0 x 2.0 5.0 x 5.0 3.7 x 3.7 40 0.4 40L QFN
10 3.0 x 3.0
11 2.0 x 2.0 7.0 x 7.0 3.8 x 3.8 48 0.5 48L QFN
12 3.0 x 3.0
13 2.0 x 2.0 9.0 x 9.0 3.75 x 3.75 64 0.5 64L QFN
14 3.0 x 3.0
15 4.0 x 4.0 7.0 x 7.0 5.8 x 5.8 48 0.5 48L QFN
16 5.0 x 5.0
17 4.0 x 4.0 9.0 x 9.0 5.8 x 5.8 64 0.5 64L QFN
18 5.0 x 5.0
19 4.0 x 4.0 10.0 x 10.0 6.2 x 6.2 72 0.5 72L QFN
20 5.0 x 5.0
21 4.0 x 4.0 12.0 x 12.0 9.7 x 9.7 80 0.5 80L QFN
22 5.0 x 5.0
23 4.0 x 4.0 10.0 x 10.0 7.6 x 7.6 88 0.4 88L QFN
24 5.0 x 5.0
25 4.0 x 4.0 12.0 x 12.0 9.2 x 9.2 100 0.4 100L QFN
26 5.0 x 5.0

Content owned & provided by Ministry of Electronics & Information Technology, Government of India

Copyright © 2023